A study of liquidated damages on highway contracts,
with a discussion of measuring and setting the contract time and some methods of determining the amount of liquidated damages
[by] A.L. Elliott, bridge engineer.
Description
Viewability
Item Link | Original Source |
---|---|
Full view | University of California |