LDR | |
01473nam a2200313 a 4500 |
001 |
|
102530210 |
003 |
|
MiAaHDL |
005 |
|
20190211000000.0 |
006 |
|
m d |
007 |
|
cr bn ---auaua |
008 |
|
910816s1971 xx a b 000 0 eng d |
035 |
⊔ |
⊔ |
‡asdr-msu.b24204663
|
040 |
⊔ |
⊔ |
‡aEEM
‡cEEM
‡dUtOrBLW
|
049 |
⊔ |
⊔ |
‡aEEMT
‡c1
|
099 |
⊔ |
⊔ |
‡a109 963 THS
|
035 |
⊔ |
⊔ |
‡a(OCoLC)24244285
|
100 |
1 |
⊔ |
‡aGrimes, Grovenor.
‡0http://id.loc.gov/authorities/names/n86017591
|
245 |
1 |
0 |
‡aEvaluation of two-lane ramp merges on urban freeways /
‡cby Grovenor Norman Grimes.
|
260 |
⊔ |
⊔ |
‡c1971.
|
300 |
⊔ |
⊔ |
‡a2 unnumbered pages, vii, 51 leaves :
‡billustrations ;
‡c29 cm
|
336 |
⊔ |
⊔ |
‡atext
‡btxt
‡2rdacontent
|
337 |
⊔ |
⊔ |
‡aunmediated
‡bn
‡2rdamedia
|
338 |
⊔ |
⊔ |
‡avolume
‡bnc
‡2rdacarrier
|
502 |
⊔ |
⊔ |
‡gThesis
‡bM.S.
‡cMichigan State University. Department of Civil Engineering
‡d1971.
|
504 |
⊔ |
⊔ |
‡aBibliography: leaves 51.
|
538 |
⊔ |
⊔ |
‡aMode of access: Internet.
|
590 |
⊔ |
⊔ |
‡aMSU: The material is stored off site. Please request materials 3 days ahead of your visit.
|
650 |
⊔ |
0 |
‡aUrban transportation.
‡0http://id.loc.gov/authorities/subjects/sh85141331
|
650 |
⊔ |
0 |
‡aTraffic engineering.
‡0http://id.loc.gov/authorities/subjects/sh85136766
|
650 |
⊔ |
0 |
‡aExpress highways
‡xDesign and construction.
‡0http://id.loc.gov/authorities/subjects/sh2009125300
|
CID |
⊔ |
⊔ |
‡a102530210
|
DAT |
0 |
⊔ |
‡a20160530154542.0
‡b20190211000000.0
|
DAT |
1 |
⊔ |
‡a20190212091422.0
‡b2024-03-28T17:55:32Z
|
DAT |
2 |
⊔ |
‡a2024-03-28T17:30:02Z
|
CAT |
⊔ |
⊔ |
‡aSDR-MSU
‡dSIERRA 1.2.1_7
‡lprepare.pl-004-008
|
FMT |
⊔ |
⊔ |
‡aBK
|
HOL |
⊔ |
⊔ |
‡0sdr-msu.b24204663
‡amsu
‡bSDR
‡cMSU
‡pmsu.31293030618668
‡sMIEM
‡1.b24204663
|
974 |
⊔ |
⊔ |
‡bMIEM
‡cMSU
‡d20240328
‡sgoogle
‡umsu.31293030618668
‡y1971
‡ric
‡qbib
‡tnon-US bib date1 >= 1929
|