Available Indexes

Draft supplement III to final environmental statement and draft environmental impact report :
Sacramento River Bank Protection Project (Butte Basin Reach) /
prepared by U. S. Army Engineer District, Sacramento, and the Reclamation Board, State of California.

Description

Tools

Language(s): English
Published: Sacramento, Calif. : The District, 1987.
Subjects: Sacramento River Bank Protection Project (Calif.)
Riparian ecology > Riparian ecology / California > Riparian ecology / California / Sacramento River.
Flood control > Flood control / California > Flood control / California / Sacramento River.
Sacramento River (Calif.) > Sacramento River (Calif.) / Levees.
Note: "July 1987."
Physical Description: vi, 60, [50] p. : ill., map (folded) ; 27 cm.
Locate a Print Version: Find in a library

Viewability

Item Link Original Source
Full view University of California
View HathiTrust MARC record