Draft supplement III to final environmental statement and draft environmental impact report :
Sacramento River Bank Protection Project (Butte Basin Reach) /
prepared by U. S. Army Engineer District, Sacramento, and the Reclamation Board, State of California.
Description
Language(s): | English |
---|---|
Published: |
Sacramento, Calif. : The District, 1987. |
Subjects: |
Sacramento River Bank Protection Project (Calif.)
Riparian ecology > Riparian ecology / California > Riparian ecology / California / Sacramento River. Flood control > Flood control / California > Flood control / California / Sacramento River. Sacramento River (Calif.) > Sacramento River (Calif.) / Levees. |
Note: |
"July 1987." |
Physical Description: |
vi, 60, [50] p. :
ill., map (folded) ;
27 cm.
|
Locate a Print Version: |
Find in a library |
Viewability
Item Link | Original Source |
---|---|
Full view | University of California |