Cost-benefit procedure for evaluation of utility corrective measures

LDR 01628nam a2200337Ia 4500
001 102512373
003 MiAaHDL
005 20190129000000.0
006 m d
007 cr bn ---auaua
008 940616s1993 fluab bt s000 0 eng d
027 ‡aFL/DOT/RMC/0547/4104
035 ‡asdr-ucbk.b115402172
040 ‡aCU-IT ‡cCU-IT
043 ‡an-us-fl
035 ‡a(OCoLC)30617722
245 0 0 ‡aCost-benefit procedure for evaluation of utility corrective measures / ‡cprepared by Fazil T. Najafi ... [et al.]
260 ‡a[Gainesville] : ‡bUniversity of Florida, Civil Engineering Dept. ; ‡a[Springfield, Va. : ‡bAvailable through the National Technical Information Service, ‡c1993]
300 ‡aix, 167 p. : ‡bill., maps ; ‡c28 cm.
500 ‡a"December 1993."
504 ‡aIncludes bibliographical references (p. 166-167)
513 ‡aFinal report. ‡bOct. 1991-Dec. 1993.
536 ‡aPrepared for the Florida Dept. of Transportation in cooperation with the Federal Highway Administration under contract no. ‡bC-4104.
538 ‡aMode of access: Internet.
650 0 ‡aElectric lines ‡zFlorida ‡xPoles and towers ‡xSafety measures ‡xCost effectiveness.
650 0 ‡aRoadside improvement ‡zFlorida ‡xCost effectiveness.
650 0 ‡aRoads ‡xLighting ‡zFlorida ‡xBreak-away supports ‡xCost effectiveness.
650 0 ‡aTraffic safety ‡zFlorida ‡xCost effectiveness.
700 1 0 ‡aNajafi, Fazil T.
710 2 0 ‡aUniversity of Florida. ‡bDepartment of Civil Engineering.
710 1 0 ‡aFlorida. ‡bDepartment of Transportation.
CID ‡a102512373
DAT 0 ‡a19181212000000.0 ‡b20190129000000.0
DAT 1 ‡a20190129090734.0 ‡b2024-05-22T17:39:13Z
DAT 2 ‡a2024-05-22T17:30:02Z
CAT ‡aSDR-UCBK ‡dIII - MILLENIUM ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-ucbk.b115402172 ‡auc1 ‡bSDR ‡cUCBK ‡puc1.c100923588 ‡sUC ‡1.b115402172
974 ‡bUC ‡cUCBK ‡d20240522 ‡sgoogle ‡uuc1.c100923588 ‡y1993 ‡ric ‡qbib ‡tUS bib date1 >= 1929