Predictive simulation of alternatives for managing the water resources of North Fork Solomon River Valley between Kirwin Dam and Waconda Lake, north-central Kansas

LDR 01713nam a2200397 a 4500
001 102511835
003 MiAaHDL
005 20190129000000.0
006 m d
007 cr bn ---auaua
008 860702s1984 ksuab b f00010 eng d
035 ‡asdr-ucbk.b100373070
035 ‡aGLADN433033
040 ‡aGIS ‡cGIS ‡dGPO ‡dAGL ‡dUDI ‡dCUY
043 ‡an-us-ks
072 ‡aP200
074 ‡a624-B
086 0 ‡aI 19.42/4:84-4249
090 ‡aHD1694.K2 ‡bB871 1984
035 ‡a(OCoLC)12005307
100 1 0 ‡aBurnett, Robert D.
245 1 0 ‡aPredictive simulation of alternatives for managing the water resources of North Fork Solomon River Valley between Kirwin Dam and Waconda Lake, north-central Kansas / ‡cby Robert D. Burnett ; prepared in cooperation with the U.S. Bureau of Reclamation.
260 0 ‡aLawrence, Kan. : ‡bU.S. Geological Survey ; ‡aDenver, Colo. : ‡bOpen-File Services Section, Western Distribution Branch, U.S. Geological Survey [distrubutor], ‡c1984.
300 ‡avi, 34 p. : ‡bill., maps ; ‡c28 cm.
490 0 ‡aWater-resources investigations report ; ‡v84-4249
500 ‡aOne folded map in pocket.
504 ‡aBibliography: p. 33-34.
538 ‡aMode of access: Internet.
650 0 ‡aWater resources development ‡zKansas ‡xMathematical models.
710 2 0 ‡aGeological Survey (U.S.)
710 1 0 ‡aUnited States. ‡bBureau of Reclamation.
CID ‡a102511835
DAT 0 ‡a19190111000000.0 ‡b20190129000000.0
DAT 1 ‡a20190129090734.0 ‡b2024-05-21T17:53:21Z
DAT 2 ‡a2024-05-21T17:30:02Z
CAT ‡aSDR-UCBK ‡dIII - MILLENIUM ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-ucbk.b100373070 ‡auc1 ‡bSDR ‡cUCBK ‡puc1.b000144657 ‡sUC ‡1.b100373070
974 ‡bUC ‡cUCBK ‡d20240521 ‡sgoogle ‡uuc1.b000144657 ‡y1984 ‡rpd ‡qbib ‡tUS fed doc