Illinois Waterway, Brandon Road Lock and Dam, major rehabilitation. Design memorandum no. 2, Joliet channel walls rehabilitation (with environmental assessment)

LDR 01357cam a2200277Ia 4500
001 102488767
003 MiAaHDL
005 20181120000000.0
006 m d
007 cr bn ---auaua
008 940120e198408 iluab t f000 0 eng d
035 ‡asdr-uiuc6809252
035 ‡a(UIUdb)6809252
035 ‡a(OCoLC)29659990
040 ‡aAFM ‡cAFM
043 ‡an-us-il
049 ‡aUIUU
090 ‡aTC202 ‡b.R62I501 no.2 1984
110 1 ‡aUnited States. ‡bArmy. ‡bCorps of Engineers. ‡bRock Island District.
245 1 0 ‡aIllinois Waterway, Brandon Road Lock and Dam, major rehabilitation. ‡nDesign memorandum no. 2, ‡pJoliet channel walls rehabilitation (with environmental assessment) / ‡cUS Army Corps of Engineers, Rock Island District.
260 ‡aRock Island, Ill. : ‡bThe District, ‡c1984.
300 ‡a1 v. (loose-leaf) : ‡bill., maps ; ‡c28 cm.
500 ‡aCover title.
538 ‡aMode of access: Internet.
650 0 ‡aHydraulic structures ‡zIllinois ‡xMaintenance and repair.
740 0 1 ‡aJoliet channel walls rehabilitation (with environmental assessment).
740 0 1 ‡aDesign memorandum no. 2, Joliet channel walls rehabilitation (with environmental assessment).
740 0 1 ‡aBrandon Road Lock and Dam, major rehabilitation, design memorandum no. 2, Joliet channel walls rehabilitation (with environmental assessment).
CID ‡a102488767
DAT 0 ‡a20120312192115.0 ‡b20181120000000.0
DAT 1 ‡a20181121090703.0 ‡b2024-07-06T17:41:00Z
CAT ‡aSDR-UIUC ‡dUNKNOWN ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-uiuc6809252 ‡auiug ‡bSDR ‡cUIUC ‡puiug.30112112925349 ‡sUIU ‡16809252
974 ‡bUIU ‡cUIUC ‡d20240706 ‡sgoogle ‡uuiug.30112112925349 ‡y1984 ‡rpd ‡qbib ‡tUS fed doc