Available Indexes

Back to Record

Back to Record

Pre-operational acceptance test procedures for the materials testing reactor.
Part II,
Post neutron tests /
prepared by Phillips Petroleum Company, Research and Development Department, Atomic Energy Division, Technical Branch ; F.W. Crawford, Technical Director, R.M. Wallace, Assistant Project Manager, R.L. Doan, Project Manager.

APA Citation

Doan, R. L., Wallace, R. M., Crawford, F. W., U.S. Atomic Energy Commission., Phillips Petroleum Company. Atomic Energy Division. (1956). Pre-operational acceptance test procedures for the materials testing reactor. Oak Ridge, Tenn.: U.S. Atomic Energy Commission, Technical Information Service .

MLA Citation

Phillips Petroleum Company. Atomic Energy Division, et al.. Pre-operational Acceptance Test Procedures for the Materials Testing Reactor. Oak Ridge, Tenn.: U.S. Atomic Energy Commission, Technical Information Service , 1956.

Warning: These citations may not always be complete (especially for serials).