Operation and maintenance costs : federal hydroelectric plants

LDR 01193nam a2200289Ia 4500
001 102423112
003 MiAaHDL
005 20180611000000.0
006 m d
007 cr bn ---auaua
008 940729s1953 nbua f000 0 eng d
035 ‡asdr-ucr.b39255451
035 ‡a(OCoLC)30847652
035 ‡aUCb118645195
040 ‡aCU-WR ‡cCU-WR
043 ‡an-uss--
099 9 ‡aG253 H3-2
245 0 0 ‡aOperation and maintenance costs : ‡bfederal hydroelectric plants / ‡cStudy Committee on Re-evaluation of Missouri Basin Project, Federal Power Commission, Bureau of Reclamation, Corps of Engineers.
260 ‡aOmaha, Neb. : ‡bArmy CE, ‡c1953.
300 ‡a1 v. (various foliations) : ‡bill. ; ‡c27 cm.
538 ‡aMode of access: Internet.
610 2 0 ‡aMissouri River Basin Project (U.S.)
650 0 ‡aHydroelectric power plants ‡zMissouri River Watershed ‡xCost of operation.
650 0 ‡aHydroelectric power plants ‡zMissouri River Watershed ‡xCosts.
710 1 ‡aUnited States. ‡bArmy. ‡bCorps of Engineers.
710 1 ‡aUnited States. ‡bBureau of Reclamation.
710 1 ‡aUnited States. ‡bFederal Power Commission.
CID ‡a102423112
DAT 0 ‡a19101116000000.0 ‡b20180611000000.0
DAT 1 ‡a20180615091411.0 ‡b2024-05-01T17:38:04Z
CAT ‡aSDR-UCR ‡dIII - MILLENIUM ‡lprepare.pl-004-007
FMT ‡aBK
HOL ‡0sdr-ucr.b39255451 ‡auc1 ‡bSDR ‡cUCR ‡puc1.31210025058809 ‡sUC ‡1.b39255451
974 ‡bUC ‡cUCR ‡d20240501 ‡sgoogle ‡uuc1.31210025058809 ‡y1953 ‡rpd ‡qbib ‡tUS fed doc