LDR | |
01279cam a2200337Ia 4500 |
001 |
|
102373020 |
003 |
|
MiAaHDL |
005 |
|
20180503000000.0 |
006 |
|
m d |
007 |
|
cr bn ---auaua |
008 |
|
980929s1979 ilua b s000 0 eng d |
035 |
⊔ |
⊔ |
‡asdr-uiuc6834974
|
035 |
⊔ |
⊔ |
‡a(UIUdb)6834974
|
035 |
⊔ |
⊔ |
‡a(OCoLC)39953793
|
040 |
⊔ |
⊔ |
‡aIUL
‡cIUL
|
043 |
⊔ |
⊔ |
‡an-us-il
|
049 |
⊔ |
⊔ |
‡aUIUU
|
050 |
⊔ |
4 |
‡aTP759
‡b.S265 1979
|
100 |
1 |
⊔ |
‡aSanghi, Ajay K.
|
245 |
1 |
4 |
‡aThe availability and resource cost of water for coal conversion /
‡c[prepared by Ajay K. Sanghi and Darlene Logsdon].
|
260 |
⊔ |
⊔ |
‡aSpringfield :
‡bIllinois Bureau of the Budget, Office of Planning,
‡c1979.
|
300 |
⊔ |
⊔ |
‡a33 leaves :
‡bill. ;
‡c28 cm.
|
490 |
0 |
⊔ |
‡aStudies in energy and environment
|
500 |
⊔ |
⊔ |
‡a"May 1979."
|
504 |
⊔ |
⊔ |
‡aIncludes bibliographical references (leaves 32-33).
|
538 |
⊔ |
⊔ |
‡aMode of access: Internet.
|
650 |
⊔ |
0 |
‡aCoal liquefaction
‡zWest (U.S.)
‡xWater-supply.
|
650 |
⊔ |
0 |
‡aCoal liquefaction
‡zMiddle West
‡xWater-supply.
|
650 |
⊔ |
0 |
‡aCoal gasification
‡zWest (U.S.)
‡xWater-supply.
|
650 |
⊔ |
0 |
‡aCoal gasification
‡zMiddle West
‡xWater-supply.
|
700 |
1 |
⊔ |
‡aLogsdon, Darlene.
|
710 |
1 |
⊔ |
‡aIllinois.
‡bBureau of the Budget.
‡bOffice of Planning.
|
CID |
⊔ |
⊔ |
‡a102373020
|
DAT |
0 |
⊔ |
‡a20120418204934.0
‡b20180503000000.0
|
DAT |
1 |
⊔ |
‡a20180504090505.0
‡b2018-05-06T18:17:20Z
|
DAT |
2 |
⊔ |
‡a2018-05-06T18:00:02Z
|
CAT |
⊔ |
⊔ |
‡aSDR-UIUC
‡dUNKNOWN
‡lprepare.pl-004-007
|
FMT |
⊔ |
⊔ |
‡aBK
|
HOL |
⊔ |
⊔ |
‡0sdr-uiuc6834974
‡auiuo
‡bSDR
‡cIUIUC
‡puiuo.ark:/13960/t6d28mc84
‡sUIU
‡16834974
‡8ia.availabilityreso00sang
|
974 |
⊔ |
⊔ |
‡8ia.availabilityreso00sang
‡bUIU
‡cIUIUC
‡d20180506
‡sia
‡uuiuo.ark:/13960/t6d28mc84
‡y1979
‡ric
‡qbib
‡tUS bib date1 >= 1930
|