LDR | |
01411nam a2200325Ia 4500 |
001 |
|
102213199 |
003 |
|
MiAaHDL |
005 |
|
20171113000000.0 |
006 |
|
m d |
007 |
|
cr bn ---auaua |
008 |
|
860925s1985 coua tb f00010 eng d |
027 |
⊔ |
⊔ |
‡aREC-ERC-84-18
|
035 |
⊔ |
⊔ |
‡asdr-ucr.b38818504
|
035 |
⊔ |
⊔ |
‡a(OCoLC)14262056
|
035 |
⊔ |
⊔ |
‡aUCb118189700
|
040 |
⊔ |
⊔ |
‡aGPO
‡cGPO
‡dCU-WR
|
043 |
⊔ |
⊔ |
‡an-us-co
|
086 |
0 |
⊔ |
‡aI 27.60:84-18
|
099 |
⊔ |
9 |
‡aG369 M5
|
100 |
1 |
0 |
‡aBoegli, W. J.
|
245 |
1 |
0 |
‡aPilot plant studies of two processes for oxidation of aqueous sulfide :
‡bParadox Valley unit, Colorado River Basin Salinity Control Project /
‡cby W.J. Boegli and A.P. Murphy.
|
260 |
⊔ |
⊔ |
‡aDenver, Colo. :
‡bApplied Sciences Branch, Division of Research and Laboratory Services, Engineering and Research Center, U.S. Dept. of the Interior, Bureau of Reclamation ;
‡aSpringfield, Va. :
‡bAvailable from the National Technical Information Service, Operations Division,
‡c[1985]
|
300 |
⊔ |
⊔ |
‡avi, 97 p. :
‡bill. ;
‡c28 cm.
|
538 |
⊔ |
⊔ |
‡aMode of access: Internet.
|
610 |
2 |
0 |
‡aColorado River Basin Salinity Control Project.
|
650 |
⊔ |
0 |
‡aElectrolytic oxidation.
|
650 |
⊔ |
0 |
‡aSaline waters
‡zColorado.
|
650 |
⊔ |
0 |
‡aHydrogen sulfide
‡xComposition.
|
700 |
1 |
0 |
‡aMurphy, A. P.
|
710 |
2 |
0 |
‡aEngineering and Research Center (U.S.).
‡bApplied Sciences Branch.
|
CID |
⊔ |
⊔ |
‡a102213199
|
DAT |
0 |
⊔ |
‡a19101116000000.0
‡b20171113000000.0
|
DAT |
1 |
⊔ |
‡a20171114090604.0
‡b2023-12-11T18:45:50Z
|
DAT |
2 |
⊔ |
‡a2023-12-11T18:30:02Z
|
CAT |
⊔ |
⊔ |
‡aSDR-UCR
‡dIII - MILLENIUM
‡lprepare.pl-004-007
|
FMT |
⊔ |
⊔ |
‡aBK
|
HOL |
⊔ |
⊔ |
‡0sdr-ucr.b38818504
‡auc1
‡bSDR
‡cUCR
‡puc1.31210022263972
‡sUC
‡1.b38818504
|
974 |
⊔ |
⊔ |
‡bUC
‡cUCR
‡d20231211
‡sgoogle
‡uuc1.31210022263972
‡y1985
‡rpd
‡qbib
‡tUS fed doc--NTIS: pubdate < 2019
|