Dept. of Energy/Dept. of Transportation gas turbine transit bus demonstration program.
Program plan.
Description
- Language(s)
-
English
- Published
-
Lemont, Illinois : Argonne National Laboratory, 1978.
- Summary
-
The project will be carried out in three phases. In Phase I, prototype turbine engines will be used. One turbine-powered bus and diesel-powered bus will be tested at a test facility to obtain baseline data. Five turbine-powered buses will be evaluated in revenue service in one city. In Phase II, preproduction turbine engines will be used. One turbine-powered bus and diesel-powered bus will be baseline tested and ten turbine-powered buses will be evaluated in two cities. In Phase III, production gas turbine engines will be used. Only the turbine-powered bus will run baseline tests in this phase. Ten turbine-powered buses will be evaluated in two cities.
This document is the program plan for a cooperative project of the Urban Mass Transportation Administration (UMTA) of the Department of Transportation and the Division of Transportation Energy Conservation (TEC) of the Department of Energy to test and evaluate the use of gas-turbine engines in transit buses. UMTA is responsible for furnishing buses from UMTA grantees, technical direction for bus/engine integration, and coordination of operational use of buses in selected cities. TEC is responsible for providing gas turbines, data acquisition/reduction services, and management for the complete project.
- Note
-
"Prepared by Booz, Allen, and Hamilton, Inc, TransportationConsulting Division for the U.S. Department of Energy, Assistant Secretary for Conservation and Solar Applications, Division of Transportation Energy Conservation, under Contract No. 31-109-38-4113."
"April 1978."
- Physical Description
-
[3], 55 pages :
illustrations, tables ;
28 cm.
Viewability
Item Link |
Original Source |
Full view
|
Technical Report Archive & Image Library
|