Los Angeles-Bakersfield high speed ground transportation preliminary engineering feasibility study : final report

LDR 01325nam a2200289Ia 4500
001 102187257
003 MiAaHDL
005 20171010000000.0
006 m d
007 cr bn ---auaua
008 960227s1994 caub 000 0 eng d
035 ‡asdr-ucbk.b116010071
040 ‡aCU-IT ‡cCU-IT
043 ‡an-us-ca
035 ‡a(OCoLC)31212247
245 0 4 ‡aLos Angeles-Bakersfield high speed ground transportation preliminary engineering feasibility study : ‡bfinal report / ‡cprepared by Parsons Brinckerhoff Quade & Douglas, Inc.
260 ‡a[Los Angeles, Calif.] : ‡bCalifornia Dept. of Transportation, District 7, ‡c[1994]
300 ‡a1 v. (various pagings) : ‡bmaps ; ‡c28 cm.
500 ‡a"December 1994."
538 ‡aMode of access: Internet.
650 0 ‡aMagnetic levitation vehicles ‡zCalifornia, Southern.
650 0 ‡aHigh speed trains ‡zCalifornia, Southern ‡xPlanning.
650 0 ‡aHigh speed ground transportation ‡zCalifornia ‡zBakersfield ‡xPlanning.
650 0 ‡aHigh speed ground transportation ‡zCalifornia ‡zLos Angeles ‡xPlanning.
710 2 ‡aParsons, Brinckerhoff, Quade & Douglas.
710 1 ‡aCalifornia. ‡bDept. of Transportation. ‡bDistrict 07.
CID ‡a102187257
DAT 0 ‡a19171005000000.0 ‡b20171010000000.0
DAT 1 ‡a20171007090548.0 ‡b2024-03-31T18:11:11Z
CAT ‡aSDR-UCBK ‡dIII - MILLENIUM ‡lprepare.pl-004-007
FMT ‡aBK
HOL ‡0sdr-ucbk.b116010071 ‡auc1 ‡bSDR ‡cUCBK ‡puc1.c101274063 ‡sUC ‡1.b116010071
974 ‡bUC ‡cUCBK ‡d20240331 ‡sgoogle ‡uuc1.c101274063 ‡y1994 ‡ric ‡qbib ‡tUS bib date1 >= 1930