Water resources planning

LDR 04902cam a22003854a 4500
001 102020135
002 u3799678
003 MiAaHDL
005 20171207000000.0
006 m d
007 cr bn ---auaua
008 001023s2001 couab b 001 0 eng
010 ‡a 00052187
020 ‡a1583210873
035 ‡asdr-uva.u3799678
035 ‡a(OCoLC)45270353
035 ‡a(Sirsi) i1583210873
040 ‡aDLC ‡cDLC ‡dDLC ‡dMvI
042 ‡apcc
043 ‡an-us---
050 0 0 ‡aTD491 ‡b.A49 no. M50 ‡aTD345
082 0 0 ‡a628.1 s ‡a363.6/1 ‡221
090 ‡aSCIENG/TD491 ‡b.A49 no. M50 ‡aTD345
245 0 0 ‡aWater resources planning.
250 ‡a1st ed.
260 ‡aDenver, CO : ‡bAmerican Water Works Association, ‡cc2001.
300 ‡axiii, 353 p. : ‡bill., map ; ‡c28 cm.
490 0 ‡aAWWA manual ; ‡vM50
500 ‡aPreparation of the manual managed by William O. Maddaus.
504 ‡aIncludes bibliographical references and index.
505 0 0 ‡gChapter 1 ‡tWater Resources Planning ‡g1 -- ‡tWater Resources Planning Process ‡g2 -- ‡gChapter 2 ‡tWater Demand Forecasting ‡g13 -- ‡tForecasting Methods ‡g15 -- ‡tData Requirements ‡g18 -- ‡tIdentifying Water Use Patterns ‡g23 -- ‡tCompiling a Demographic Database ‡g31 -- ‡tNaturally Occurring and Programmed Conservation ‡g32 -- ‡tIdentify System Losses (Unaccounted-for Water) ‡g33 -- ‡tComplete the Integrated Forecast Model ‡g34 -- ‡tSensitivity Analysis ‡g37 -- ‡gChapter 3 ‡tWater Rights and Policy ‡g45 -- ‡tGeneral Water Rights ‡g46 -- ‡tFederal Water Rights ‡g51 -- ‡tAWWA Water Policy ‡g53 -- ‡gChapter 4 ‡tAlternative Sources ‡g55 -- ‡tSurface Water ‡g55 -- ‡tGroundwater ‡g63 -- ‡tConservation ‡g72 -- ‡tReclaimed Water ‡g91 -- ‡tDesalination ‡g104 -- ‡tWater Marketing and Transfers ‡g115 -- ‡tIdentification of Timing and Magnitude of New Source Development ‡g121 -- ‡gChapter 5 ‡tWater Quality ‡g125 -- ‡tHydrologic Cycle and Water Quality ‡g125 -- ‡tSurface Water Quality ‡g126 -- ‡tGroundwater Quality ‡g126 -- ‡tPhysical, Chemical, and Biological Components Influencing Water Quality ‡g127 -- ‡tSources of Contaminant Loading in Water ‡g131 -- ‡tWater Quality Sampling and Monitoring ‡g135 -- ‡gChapter 6 ‡tHydrologic Modeling ‡g139 -- ‡tHydrologic Models: What, Why, How, and When ‡g140 -- ‡tHydrologic Models and Their Use ‡g143 -- ‡tModels and the Hydrologic Cycle ‡g147 -- ‡tHydrologic Models: Data, Calibration, Sensitivity, and Errors ‡g163 -- ‡gChapter 7 ‡tRegulatory Issues ‡g179 -- ‡tClean Water Act ‡g180 -- ‡tDrinking Water Quality Standards ‡g182 -- ‡t1986 Amendments ‡g187 -- ‡t1996 Amendments ‡g193 -- ‡gChapter 8 ‡tEnvironmental Impact Analysis ‡g207 -- ‡tEnvironmental Impact Planning ‡g207 -- ‡tPreparing Environmental Impact Documentation ‡g210 -- ‡tInformation in Environmental Impact Documents ‡g214 -- ‡tPermits and Approvals in the Environmental Process ‡g216 -- ‡gChapter 9 ‡tWatershed Management and Groundwater Protection ‡g221 -- ‡tSurface Water Source Protection ‡g222 -- ‡tGroundwater Source Protection ‡g233 -- ‡gChapter 10 ‡tEconomic Feasibility ‡g247 -- ‡tMultiobjective Decisions: Economics as One of Several Objectives ‡g247 -- ‡tEconomic Factors ‡g247 -- ‡tEconomic Variables: Costs and Benefits ‡g248 -- ‡tTime and Discount Rate ‡g253 -- ‡tComparison Methodologies ‡g256 -- ‡gChapter 11 ‡tIntegrated Resource Planning ‡g263 -- ‡tOverview of the IRP Process ‡g266 -- ‡tPlan Outline ‡g270 -- ‡tForming Resource Combinations ‡g275 -- ‡tEvaluating Resource Combinations ‡g278 -- ‡tSelecting and Implementing a Plan ‡g283 -- ‡tPublic Participation ‡g286 -- ‡gCase Study #1 ‡tPortland, Oregon, Regional Water Supply Plan ‡g293 -- ‡gCase Study #2 ‡tCity of Colorado Springs, Colorado, Integrated Resource Plan ‡g295 -- ‡gCase Study #3 ‡tDenver, Colorado, Metropolitan Area ‡g296 -- ‡gCase Study #4 ‡tKentucky--American Water Company's Integrated Resource Plan ‡g300 -- ‡gCase Study #5 ‡tWichita, Kansas, Integrated Resource Plan ‡g301 -- ‡gCase Study #6 ‡tWare Creek Reservoir, Virginia ‡g302 -- ‡gCase Study #7 ‡tSouthern Nevada Water Authority Integrated Resource Plan ‡g304 -- ‡gCase Study #8 ‡tEugene, Oregon, Water and Electric Board Water Supply Plan ‡g307 -- ‡gAppendix A ‡tPreliminary Cost Guide for Water Supply Dams ‡g311 -- ‡tSelecting the Appropriate Dam Type ‡g311 -- ‡tEstablishing Dam Profile Layout ‡g312 -- ‡tProfile Layout and Basis for Estimating Quantity ‡g313 -- ‡tEarth Fill Dam Assessment--Preliminary Layout and Opinion of Cost ‡g316 -- ‡tEarth Dam--Opinion of Cost ‡g317 -- ‡gAppendix B ‡tA White Paper From the AWWA Source Water Protection ‡g319 -- ‡tRoad to a Source Water Protection Program ‡g320 -- ‡tDeveloping Resources for Source Water Protection ‡g321 -- ‡gAppendix C ‡tState Well Head and Source Water Protection ‡g323.
538 ‡aMode of access: Internet.
596 ‡a14
650 0 ‡aWater-supply ‡zUnited States ‡xPlanning ‡vCase studies.
650 0 ‡aWater resources development.
650 0 ‡aWater consumption ‡xForecasting.
650 0 ‡aWater-supply ‡xPlanning.
700 1 ‡aMaddaus, William O.
CID ‡a102020135
DAT 0 ‡a20010920145530.0 ‡b20171207000000.0
DAT 1 ‡a20171213100613.0 ‡b2023-10-18T17:56:39Z
DAT 2 ‡a2023-10-18T17:30:02Z
CAT ‡aSDR-UVA ‡dUNKNOWN ‡lprepare.pl-004-007
FMT ‡aBK
HOL ‡0sdr-uva.u3799678 ‡auva ‡bSDR ‡cUVA ‡puva.x004592225 ‡sUVA ‡zno. M50 ‡1u3799678
974 ‡bUVA ‡cUVA ‡d20231018 ‡sgoogle ‡uuva.x004592225 ‡zno. M50 ‡y2001 ‡ric ‡qbib ‡tUS bib date1 >= 1930