LDR | |
01418cam a2200325Ki 4500 |
001 |
|
101705985 |
003 |
|
MiAaHDL |
005 |
|
20160726000000.0 |
006 |
|
m d |
007 |
|
cr bn ---auaua |
008 |
|
900530s1952 dcua f000 0 eng |
010 |
⊔ |
⊔ |
‡a 52061925
|
035 |
⊔ |
⊔ |
‡asdr-uiuc1918299
|
035 |
⊔ |
⊔ |
‡9UC 19021352
|
035 |
⊔ |
⊔ |
‡9APE-6347
|
035 |
⊔ |
⊔ |
‡a(OCoLC)13718885
|
040 |
⊔ |
⊔ |
‡aDLC
‡cGZD
‡dGZD
‡dIUL
‡dUIU
|
049 |
⊔ |
⊔ |
‡aUIUU
|
050 |
0 |
0 |
‡aHD171.A18
‡bA32 82d , 1st no. 20
|
082 |
0 |
0 |
‡a627.12
|
086 |
0 |
⊔ |
‡aY 4.IN 8/14:82/20
|
110 |
1 |
⊔ |
‡aUnited States.
‡bCongress.
‡bHouse.
‡bCommittee on Interior and Insular Affairs.
|
245 |
1 |
0 |
‡aHells Canyon Dam :
‡bHearings before the subcommittee on Irrigation and Reclamation of the Committee on Interior and Insular Affairs, House of Representatives, Eighty-second Congress, second session, on H.R. 5743, a bill to authorize the construction, operation an maintenance of the initial phase of the Snake River reclamation project by the Secretary of the Interior.
|
260 |
⊔ |
⊔ |
‡aWashington :
‡bG.P.O.,
‡c1952.
|
300 |
⊔ |
⊔ |
‡aiii, 897 p. :
‡bill. ;
‡c23 cm.
|
490 |
0 |
⊔ |
‡aIts serial ;
‡vno. 20
|
500 |
⊔ |
⊔ |
‡aClair Engle, chairman of subcommittee.
|
538 |
⊔ |
⊔ |
‡aMode of access: Internet.
|
651 |
⊔ |
0 |
‡aHells Canyon Dam (Projected)
|
651 |
⊔ |
0 |
‡aSnake River.
|
CID |
⊔ |
⊔ |
‡a101705985
|
DAT |
0 |
⊔ |
‡a20030810050655.0
‡b20160726000000.0
|
DAT |
1 |
⊔ |
‡a20180312230024.0
‡b2023-08-14T18:16:14Z
|
DAT |
2 |
⊔ |
‡a2023-08-14T17:30:02Z
|
CAT |
⊔ |
⊔ |
‡aSDR-UIUC
‡dUNKNOWN
‡lprepare.pl-004-007
|
FMT |
⊔ |
⊔ |
‡aBK
|
HOL |
⊔ |
⊔ |
‡0sdr-uiuc1918299
‡auiug
‡bSDR
‡cUIUC
‡puiug.30112119563531
‡sUIU
‡11918299
|
974 |
⊔ |
⊔ |
‡bUIU
‡cUIUC
‡d20230814
‡sgoogle
‡uuiug.30112119563531
‡y1952
‡rpd
‡qbib
‡tUS fed doc
|