10-year plan for the Illinois State Toll Highway Authority /
prepared by Consoer Townsend Envirodyne Engineers, Inc.
Description
- Language(s)
-
English
- Published
-
[Springfield, Ill.] : Illinois State Toll Highway Authority, 2001.
- Summary
-
Summary: This report lays out in detail, the conclusion of an exhaustive, 2 1/2-year study of the Illinois Tollway System's infrastructure, operations and use. The 10-Year Plan represents a balance between the most effective use of currently available revenues and the identification of necessary future improvements. The plan is comprised of two distinct parts: first, the Tollway Authority's current Multi-Year Program for 2001-2005, and second, planned necessary improvements for 2005-2010.
- Note
-
"March 2001"--Cover.
- Physical Description
-
v, 31, 9 folded leaves of plates :
maps (some col.) ;
28 cm.
Viewability