Review of inconsistencies between SUDAS and Iowa DOT specifications :
phase III : continued implementation of recommendations into SUDAS specifications : final report /
Steven A. Klocke, Cindy A. Spencer.
Description
- Language(s)
-
English
- Published
-
Ankeny, Iowa : Snyder & Associates, Inc., 2010.
- Summary
-
This project completes the Inconsistencies study that began nearly five years ago. The project has resulted in significant revisions to both the SUDAS and the Iowa DOT specifications, eliminating numerous conflicts and confusion for designers and contractors. The project also established a process of collaboration between a State DOT and local communities that is unique to the State of Iowa. It is essential that this attitude of cooperation continue as the Iowa DOT and SUDAS work together to maintain the existing shared specifications and common figures. Without continuous communication, inconsistencies could be re-introduced into the documents, creating confusion for the end -users. Finally, it is recommended that SUDAS and the Iowa DOT continue to expand their collaborative efforts to develop additional shared specifications and common figures and look to add joint design standards for common areas of design.
- Note
-
Depository.
Cover title.
"December 2010."
- Physical Description
-
1 v. (various pagings) :
ill. ;
28 cm.
Viewability