Final staff report : Route 24/Caldecott Tunnel corridor study

LDR 01602nam a2200385Ia 4500
001 100853462
003 MiAaHDL
005 20151201000000.0
006 m d
007 cr bn ---auaua
008 060718s2001 cauab t s000 0 eng d
035 ‡asdr-ucbk.b117013134
040 ‡aCBT ‡cCBT
043 ‡an-us-ca
035 ‡a(OCoLC)70589170
245 0 0 ‡aFinal staff report : ‡bRoute 24/Caldecott Tunnel corridor study.
246 3 0 ‡aRoute 24/Caldecott Tunnel corridor study
260 ‡aOakland, Calif. : ‡bMetropolitan Transportation Commission, ‡c[2001]
300 ‡avi, 83 p. : ‡bchart, maps ; ‡c28 cm.
500 ‡a"January 5, 2001."
500 ‡aPerformed in partnership with Caltrans, Alameda County Congestion Management Agency, Contra Costa Transportation Authority.
513 ‡aFinal staff report.
538 ‡aMode of access: Internet.
650 0 ‡aTraffic congestion ‡zCalifornia ‡zContra Costa County.
650 0 ‡aTraffic congestion ‡zCalifornia ‡zAlameda County.
650 0 ‡aTraffic flow ‡zCalifornia ‡zOakland.
650 0 ‡aTunnels ‡zCalifornia ‡zOakland ‡xPlanning.
651 0 ‡aCalifornia Highway 24 (Calif.)
651 0 ‡aCaldecott Tunnel (Calif.)
710 2 ‡aContra Costa Transportation Authority (Calif.)
710 2 ‡aAlameda County Congestion Management Agency (Calif.)
710 1 ‡aCalifornia. ‡bMetropolitan Transportation Commission.
710 1 ‡aCalifornia. ‡bDepartment of Transportation.
CID ‡a100853462
DAT 0 ‡a19151130000000.0 ‡b20151201000000.0
DAT 1 ‡a20151203090543.0 ‡b2024-03-30T18:03:41Z
CAT ‡aSDR-UCBK ‡dIII - MILLENIUM ‡lprepare.pl-004-004
FMT ‡aBK
HOL ‡0sdr-ucbk.b117013134 ‡auc1 ‡bSDR ‡cUCBK ‡puc1.c101042805 ‡sUC ‡1.b117013134
974 ‡bUC ‡cUCBK ‡d20240330 ‡sgoogle ‡uuc1.c101042805 ‡y2001 ‡ric ‡qbib ‡tUS bib date1 >= 1929