An evaluation of the cost effectiveness of HOV lanes

LDR 01187cam a2200289Ia 4500
001 100853333
003 MiAaHDL
005 20151201000000.0
006 m d
007 cr bn ---auaua
008 871021s1987 wau b s000 0 eng d
027 ‡aWA-RD-121.1
035 ‡asdr-ucbk.b116660508
040 ‡aCU-IT ‡cCU-IT
035 ‡a(OCoLC)29727143
100 1 ‡aUlberg, Cy.
245 1 3 ‡aAn evaluation of the cost effectiveness of HOV lanes / ‡cby Cy Ulberg.
260 ‡a[Olympia, Wash.] : ‡bWashington State Dept. of Transportation, ‡c[1987]
300 ‡a16 p. ; ‡c28 cm.
500 ‡a"July 1987."
504 ‡aIncludes bibliographical references.
513 ‡aDraft final report.
536 ‡aPerformed by the Washington State Transportation Center in cooperation with the Federal Highway Administration under research project no. ‡dY3399.
538 ‡aMode of access: Internet.
650 0 ‡aHigh occupancy vehicle lanes ‡xCost effectiveness.
650 0 ‡aBus lanes ‡xCost effectiveness.
710 2 ‡aWashington State Transportation Center.
710 1 ‡aWashington (State). ‡bDepartment of Transportation.
CID ‡a100853333
DAT 0 ‡a19151130000000.0 ‡b20151201000000.0
DAT 1 ‡a20151203090543.0 ‡b2024-03-30T18:03:44Z
CAT ‡aSDR-UCBK ‡dIII - MILLENIUM ‡lprepare.pl-004-004
FMT ‡aBK
HOL ‡0sdr-ucbk.b116660508 ‡auc1 ‡bSDR ‡cUCBK ‡puc1.c101099362 ‡sUC ‡1.b116660508
974 ‡bUC ‡cUCBK ‡d20240330 ‡sgoogle ‡uuc1.c101099362 ‡y1987 ‡ric ‡qbib ‡tUS bib date1 >= 1930