Thornton Composite Reservoir : feasibility study of options A, B, and C : part 3

LDR 01248cam a2200313 a 4500
001 100816835
003 MiAaHDL
005 20150410000000.0
006 m d
007 cr bn ---auaua
008 880425s1987 iluab b s00000 eng d
035 ‡asdr-uiuc1235649
035 ‡9AHC-0801
035 ‡a(OCoLC)17848060
040 ‡aSPI ‡cSPI
043 ‡an-us-il
245 0 0 ‡aThornton Composite Reservoir : ‡bfeasibility study of options A, B, and C : part 3 / ‡cHarza Engineering Company.
260 0 ‡aSpringfield, Ill. : ‡bIllinois Dept. of Transportation, ‡c[1987].
265 ‡aIllinois Dept. of Transportation, DOT Administration Bldg., Springfield, IL 62764
300 ‡a1 v. (various pagings) : ‡bill., maps (some folded) ; ‡c28 cm.
500 ‡a"May, 1987."
500 ‡a"Little Calumet Basin flood control.
500 ‡aAt head of title: Thorn Creek Project.
500 ‡aCover title.
504 ‡aIncludes bibliographies.
538 ‡aMode of access: Internet.
650 0 ‡aReservoirs ‡zIllinois.
650 0 ‡aStorm water retention basins ‡zIllinois.
650 0 ‡aFlood dams and reservoirs ‡zIllinois.
710 2 0 ‡aHarza Engineering Company.
710 1 0 ‡aIllinois. ‡bDept. of Transportation.
740 0 1 ‡aThorn Creek Project.
740 0 1 ‡aLittle Calumet Basin flood control.
CID ‡a100816835
DAT 0 ‡a20020415162032.0 ‡b20150410000000.0
DAT 1 ‡a20180312221615.0 ‡b2024-03-25T18:00:05Z
DAT 2 ‡a2024-03-25T17:30:02Z ‡b2016-07-17T20:00:02Z
CAT ‡aSDR-UIUC ‡dUNKNOWN ‡lprepare.pl-004-007
FMT ‡aBK
HOL ‡0sdr-uiuc1235649 ‡auiug ‡bSDR ‡cUIUC ‡puiug.30112088628265 ‡sUIU ‡11235649
974 ‡bUIU ‡cUIUC ‡d20240325 ‡sgoogle ‡uuiug.30112088628265 ‡y1987 ‡rcc-by-4.0 ‡qcon