Dustproofing unsurfaced areas : facilities technology application test (FTAT) demonstration, FY 85

LDR 01563cam a2200361Ia 4500
001 100394136
003 MiAaHDL
005 20220618000000.0
006 m d
007 cr bn ---auaua
008 870217e198612 msuab t f000 0 eng d
035 ‡a(MiU)990131348250106381
035 ‡asdr-miu.990131348250106381
035 ‡z(MiU)MIU01000000000000013134825-goog
035 ‡a(OCoLC)15204282
035 ‡z(MiU)Aleph013134825
040 ‡aAFM ‡beng ‡cAFM ‡dOCL ‡dOCLCQ ‡dOCLCF ‡dOCLCO ‡dTRAAL
049 ‡aMAIN
090 ‡aTA7 ‡b.W34 no.GL-86-20
100 1 ‡aHass, Robert A.
245 1 0 ‡aDustproofing unsurfaced areas : ‡bfacilities technology application test (FTAT) demonstration, FY 85 / ‡cby Robert A. Hass ; prepared for Department of the Army, US Army Corps of Engineers.
260 ‡aVicksburg, Miss. : ‡bU.S. Army Engineer Waterways Experiment Station ; ‡a[Springfield, Va. : ‡bAvailable from National Technical Information Service, ‡c1986]
300 ‡a50 p. in various pagings : ‡bill., maps ; ‡c28 cm.
336 ‡atext ‡btxt ‡2rdacontent
337 ‡aunmediated ‡bn ‡2rdamedia
338 ‡avolume ‡bnc ‡2rdacarrier
490 0 ‡aTechnical report ; ‡vGL-86-20
500 ‡a"December 1986."
500 ‡aSpine title: "Dustproofing unsurfaced areas: FTAT demonstration, FY 85."
500 ‡aCover title.
513 ‡aFinal report.
538 ‡aMode of access: Internet.
650 7 ‡aDust control. ‡2fast ‡0(OCoLC)fst00899652
650 0 ‡aDust control.
710 1 ‡aUnited States. ‡bArmy. ‡bCorps of Engineers.
710 2 ‡aU.S. Army Engineer Waterways Experiment Station.
730 0 ‡aTechnical Report Archive & Image Library (TRAIL)
899 ‡a39015086521377
CID ‡a100394136
DAT 0 ‡b20220618000000.0
DAT 1 ‡a20220619060753.0 ‡b2024-03-16T17:43:15Z
CAT ‡aSDR-MIU ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990131348250106381 ‡aMiU ‡bSDR ‡cGWLA ‡pmdp.39015086521377 ‡sMIU ‡1990131348250106381
974 ‡bMIU ‡cGWLA ‡d20240316 ‡sgoogle ‡umdp.39015086521377 ‡y1986 ‡rpd ‡qbib ‡tUS fed doc--NTIS: pubdate < 2018