Preliminary proposal for experimental gas cooled reactor :
prepared for United States Atomic Energy Commission, Oak Ridge Operatons Office.
Appendix C,
Preliminary proposal drawings /
prepared by Kaiser Engineers and Allis-Chalmers Manufacturing Company.
Description
- Language(s)
-
English
- Published
-
Oakland, Calif. : Kaiser Engineers ; [1959]
- Summary
-
This report summarizes the conceptual design study on the experimental gas cooled reactor under construction in the Oak Ridge area.
- Note
-
"Contract no. AT(10-1)-925.
"August 1959."
"AECU-4701 (Pt. 2)."
- Physical Description
-
95 pages :
illustrations ;
27 x 41 cm.
Viewability
Item Link |
Original Source |
Full view
|
Technical Report Archive & Image Library
|