Lock design, bottom longitudinal filling and emptying system :
final report /
by Thomas E. Murphy ; prepared for Office, Chief of Engineers, U.S. Army, Washington, D. C.
Description
Viewability
Item Link | Original Source |
---|---|
Full view | University of Illinois at Urbana-Champaign |
Full view | University of California |