Master plan update design memorandum no. 16, Paint Creek Lake

LDR 01278cam a2200265 a 4500
001 011390372
003 MiAaHDL
005 20141009010000.0
006 m d
007 cr bn ---auaua
008 850701m19849999wvuab f00000 eng d
035 ‡asdr-uiuc772656
035 ‡asdr-uva.u1541522
035 ‡9ADE-3079
035 ‡a(OCoLC)12220711
040 ‡aGPO ‡cGPO ‡dUIU
043 ‡an-us-oh
074 ‡a337
086 0 ‡aD 103.2:P 16/2/des.memo.16
245 0 0 ‡aMaster plan update design memorandum no. 16, Paint Creek Lake / ‡cprepared for Department of the Army, Huntington District, Corps of Engineers by Ohio Department of Natural Resources, Office of Outdoor Recreation Services under contract no. DACW69-82-C-0097.
260 0 ‡aHuntington, W.V. : ‡bThe District, ‡c[1984]-
300 ‡a1 v. (loose-leaf) : ‡bill., maps (some col.) ; ‡c28 cm.
500 ‡aCover title: Paint Creek Lake, Bainbridge, Ohio, master plan update design memorandum no. 16.
500 ‡a"December 1984."
538 ‡aMode of access: Internet.
650 0 ‡aNational parks and reserves ‡zOhio.
650 0 ‡aRecreation areas ‡zOhio.
710 1 0 ‡aOhio. ‡bOffice of Outdoor Recreation Services.
710 1 0 ‡aUnited States. ‡bArmy. ‡bCorps of Engineers. ‡bHuntington District.
740 0 1 ‡aPaint Creek Lake, Bainbridge, Ohio, master plan update design memorandum no. 16.
CID ‡a011390372
DAT 0 ‡a20020415161716.0 ‡b20141009010000.0
DAT 1 ‡a20141112162646.0 ‡b2023-03-14T18:09:27Z
CAT ‡aSDR-UIUC ‡dUNKNOWN ‡lloader.pl-003-020
FMT ‡aBK
HOL ‡0sdr-uiuc772656 ‡auiug ‡bSDR ‡cUIUC ‡puiug.30112105160029 ‡sUIU ‡1772656
974 ‡bUIU ‡cUIUC ‡d20230314 ‡sgoogle ‡uuiug.30112105160029 ‡rpd ‡qbib ‡tUS fed doc
974 ‡bUVA ‡cUVA ‡d20231021 ‡sgoogle ‡uuva.x030448168 ‡rpd ‡qbib ‡tUS fed doc