Construction site second floor of library for Central Library of the Saint Paul Public Library
Description
- Published
-
12/2/1914
- Summary
-
9159f20ee426f26d0ebeb80fd7c036f8
Photograph is taken from an elevated position from present day corner of Washington and 4th Streets. The first floor is enclosed and work on the second floor has begun. A power lift between the scaffolds in now complete and will move building materials to the upper floors. The part of the building on Kellogg Boulevard and Washington Street side, appears to have a rectangular open area. This opening will eventually house eight floors of metal stacks for library materials.
- Note
-
United States
Minnesota
Ramsey
Downtown Saint Paul
St. Paul
- Use and Reproduction Note
-
This image may not be reproduced for any reason without the express written consent of the Saint Paul Public Library.
- Locate a Print Version
-
Find in a library service is not available from this catalog. Search Worldcat
Viewability
Item Link |
Original Source |
Full view
|
Minnesota Digital Library
|