Development of a new process for determining design year traffic demands

LDR 03671cam a2200337Ia 4500
001 010640635
003 MiAaHDL
005 20110705000000.0
006 m d
007 cr bn ---auaua
008 080609s2007 iaua bt 000 0 eng d
035 ‡asdr-nwu5112677
035 ‡a(OCoLC)231402701
040 ‡aUIG ‡cUIG ‡dJCR
043 ‡an-us-ia
049 ‡aJCRA
090 ‡aHE328.W33 ‡bD489
245 0 0 ‡aDevelopment of a new process for determining design year traffic demands / ‡cNeal R. Hawkins ... [et al.].
260 ‡aAmes, IA : ‡bCenter for Transportation Research and Education, Iowa State University, ‡c[2007]
300 ‡axiv, 39 p. : ‡bcol. ill. ; ‡c28 cm.
500 ‡a"April 2007."
504 ‡aIncludes bibliographical references (p. 37-39).
513 ‡aFinal report.
520 3 ‡aWe as researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today's regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city's western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took GIS-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.
530 ‡aAlso available online.
536 ‡aPerformed by Center for Transportation Research and Education, Iowa State University, sponsored by Iowa Highway Research Board and Iowa Dept. of Transportation ‡fIHRB project TR-528 ‡fCTRE project 05-192
538 ‡aMode of access: Internet.
650 0 ‡aTransportation ‡zIowa ‡zJohnston ‡xPlanning.
650 0 ‡aTransportation ‡zIowa ‡zWest Des Moines ‡xPlanning.
650 0 ‡aTraffic estimation ‡zIowa ‡zJohnston.
650 0 ‡aTraffic estimation ‡zIowa ‡zWest Des Moines.
700 1 ‡aHawkins, Neal R.
710 2 ‡aIowa State University. ‡bCenter for Transportation Research and Education.
710 1 ‡aIowa. ‡bDept. of Transportation.
710 1 ‡aIowa. ‡bHighway Research Board.
CID ‡a010640635
DAT 0 ‡a20080623103620.0 ‡b20110705000000.0
DAT 1 ‡a20120815043206.0 ‡b2023-09-08T17:43:11Z
DAT 2 ‡a2023-09-08T17:30:02Z
CAT ‡aSDR-NWU ‡dUNKNOWN ‡lloader.pl-001-001
FMT ‡aBK
HOL ‡0sdr-nwu5112677 ‡aien ‡bSDR ‡cNWU ‡pien.35556038615712 ‡sIEN ‡15112677
974 ‡bIEN ‡cNWU ‡d20230908 ‡sgoogle ‡uien.35556038615712 ‡y2007 ‡ric ‡qbib ‡tUS bib date1 >= 1929