A preliminary examination of railroad dispatcher workload, stress, and fatigue

LDR 01642cam a2200385 a 4500
001 010608470
003 MiAaHDL
005 20110215000000.0
006 m d
007 cr bn ---auaua
008 020621s2001 dcuad bt f000 0 eng d
027 ‡aDOT/FRA/ORD-01/08
035 ‡asdr-nwu3294720
035 ‡a(OCoLC)50135833
037 ‡aPB2002-105455 ‡bNTIS
040 ‡aCBT ‡cCBT ‡dIEN-Tr
043 ‡an-us---
050 0 4 ‡aTF563 ‡b.P67 2001
100 1 ‡aPopkin, S.
245 1 2 ‡aA preliminary examination of railroad dispatcher workload, stress, and fatigue / ‡cS. Popkin, J. Gertler, S. Reinach.
260 ‡aWashington, D.C. : ‡bFederal Railroad Administration, Office of Research and Development ; ‡a[Springfield, VA : ‡bAvailable through the National Technical Information Service, ‡c2001]
300 ‡axiii, 193 p. : ‡bill., charts ; ‡c28 cm.
500 ‡a"May 2001."
500 ‡aCover title.
504 ‡aIncludes bibliographical references (p. 109-112).
513 ‡aFinal report. ‡bMarch 1996-Sept. 1998.
530 ‡aAlso available online from the website of the Federal Railroad Administration (www.fra.dot.gov).
536 ‡aPerformed by Foster-Miller, Inc.
538 ‡aMode of access: Internet.
650 7 ‡aRailroads ‡xTrain control. ‡2tlsh
650 7 ‡aRailroads ‡xEmployees ‡xFatigue. ‡2tlsh
650 7 ‡aRailroads ‡xEmployees ‡xStress. ‡2tlsh
650 0 ‡aRailroads ‡xEmployees ‡xPsychology.
650 0 ‡aRailroads ‡xEmployees ‡xJob stress.
650 0 ‡aRailroad trains ‡xDispatching.
700 1 ‡aReinach, S.
700 1 ‡aGertler, Judith B.
710 2 ‡aFoster-Miller.
710 1 ‡aUnited States. ‡bFederal Railroad Administration. ‡bOffice of Research and Development.
CID ‡a010608470
DAT 0 ‡a20061011140941.0 ‡b20110215000000.0
DAT 1 ‡a20120815042142.0 ‡b2023-09-14T17:38:35Z
DAT 2 ‡a2023-09-14T17:30:02Z
CAT ‡aSDR-NWU ‡dUNKNOWN ‡lloader.pl-001-001
FMT ‡aBK
HOL ‡0sdr-nwu3294720 ‡aien ‡bSDR ‡cNWU ‡pien.35556033444944 ‡sIEN ‡13294720
974 ‡bIEN ‡cNWU ‡d20230914 ‡sgoogle ‡uien.35556033444944 ‡y2001 ‡rpd ‡qbib ‡tUS fed doc--NTIS: pubdate < 2019