LDR | |
00920nam a2200217 a 4500 |
001 |
|
010607874 |
003 |
|
MiAaHDL |
005 |
|
20110215000000.0 |
006 |
|
m d |
007 |
|
cr bn ---auaua |
008 |
|
781006s1977 txua b s00000 eng d |
035 |
⊔ |
⊔ |
‡asdr-nwu2610808
|
035 |
⊔ |
⊔ |
‡9AAV0027TR
|
040 |
⊔ |
⊔ |
‡aIEN-Tr
|
245 |
0 |
3 |
‡aAn analysis of various work-time scheduling methods :
‡bspecial study /
‡cby Richard L. Tyler ; [Texas] State Department of Highways and Public Transportation Transportation Planning Division.
|
260 |
0 |
⊔ |
‡a[Austin, Tex.] :
‡bThe Department,
‡c1977.
|
300 |
⊔ |
⊔ |
‡avii, 42 leaves :
‡bill ;
‡c28 cm.
|
490 |
0 |
⊔ |
‡aFHWATX78-192-3
|
500 |
⊔ |
⊔ |
‡aDistributed by NTIS.
|
500 |
⊔ |
⊔ |
‡aPrepared in cooperation with U.S. Federal Highway Administration.
|
504 |
⊔ |
⊔ |
‡aBibliography: p. 40-41.
|
538 |
⊔ |
⊔ |
‡aMode of access: Internet.
|
650 |
⊔ |
7 |
‡aPersonnel
‡xWork rules.
‡2tlsh
|
700 |
1 |
0 |
‡aTyler, Richard L.
|
710 |
1 |
0 |
‡aUnited States.
‡bFederal Highway Administration.
|
710 |
1 |
0 |
‡aTexas.
‡bTransportation Planning Division.
|
CID |
⊔ |
⊔ |
‡a010607874
|
DAT |
0 |
⊔ |
‡b20110215000000.0
|
DAT |
1 |
⊔ |
‡a20120815042142.0
‡b2024-02-11T18:31:45Z
|
DAT |
2 |
⊔ |
‡a2024-02-11T18:30:02Z
‡b2018-12-12T21:00:02Z
|
CAT |
⊔ |
⊔ |
‡aSDR-NWU
‡dUNKNOWN
‡lloader.pl-001-001
|
FMT |
⊔ |
⊔ |
‡aBK
|
HOL |
⊔ |
⊔ |
‡0sdr-nwu2610808
‡aien
‡bSDR
‡cNWU
‡pien.35556021002860
‡sIEN
‡12610808
|
974 |
⊔ |
⊔ |
‡bIEN
‡cNWU
‡d20240211
‡sgoogle
‡uien.35556021002860
‡y1977
‡rpdus
‡qncn
|