Theoretical investigation of optimum methods for preparing controlled mosaics from 9 x 18-inch format, long focal length photography.
[Prepared for] Engineer Research & Development Laboratories, Corps of Engineers, the Engineer Center, U. S. Army, Fort Belvoir, Virginia, 10 July 1957 to 10 February 1958. Arthur J. McNair, project director.
Description
- Language(s)
-
English
- Published
-
Ithaca, N. Y. [1958]
- Note
-
"Contract no. DA-44-009 Eng-3364, Department of the Army Project no. 8-35-03-216.j"
At head of title: Phase I-Interim technical report.
- Physical Description
-
iv, 49 l.
illus.
27 cm.
Viewability
Item Link |
Original Source |
Full view
|
Cornell University
|