Inspection of small diameter tubing by eddy-current methods

LDR 01125nam a2200313Ka 4500
001 007842151
003 MiAaHDL
005 20150218000000.0
006 m d
007 cr bn ---auaua
008 091020s1957 tnuac 000 0 eng d
035 ‡a(MiU)007842151
035 ‡asdr-miu007842151
035 ‡a(OCoLC)457269990
040 ‡aORNLS ‡cORNLS
049 ‡aORNA
100 1 ‡aAllen, J. W.
245 1 0 ‡aInspection of small diameter tubing by eddy-current methods / ‡cJ.W. Allen [and] R.B. Oliver.
260 ‡aOak Ridge, Tenn. : ‡bOak Ridge National Laboratory, ‡c1957.
300 ‡a35 p. : ‡bill., charts ; ‡c28 cm.
490 0 ‡aORNL ; ‡v2253
500 ‡a"Date issued: Mar 11, 1957."
500 ‡aAt head of title: Metallurgy Division.
504 ‡aIncludes bibliographical references.
536 ‡aOperated by Union Carbide Nuclear Company ‡bContract No. W-7405-eng-26
538 ‡aMode of access: Internet.
650 0 ‡aEddy currents (Electric)
650 0 ‡aEddy current testing.
700 1 ‡aOliver, R. B. ‡ejoint author.
710 2 ‡aU.S. Atomic Energy Commission.
710 2 ‡aOak Ridge National Laboratory ‡bMetallurgy Division.
CID ‡a007842151
DAT 0 ‡a20150218153030.0 ‡b20150218000000.0
DAT 1 ‡a20150219090554.0 ‡b2019-01-13T19:02:34Z
DAT 2 ‡a2019-01-13T19:00:02Z
CAT ‡aSDR-MIU ‡dEX LIBRIS - ALEPH ‡lloader.pl-003-020
FMT ‡aBK
HOL ‡0sdr-miu007842151 ‡aMiU ‡bSDR ‡cGWLA ‡pmdp.39015077296500 ‡sMIU ‡1007842151
974 ‡bMIU ‡cGWLA ‡d20190113 ‡sgoogle ‡umdp.39015077296500 ‡y1957 ‡rpd ‡qren