Development of titanium load cells for support load determination

LDR 01276cam a2200361Ia 4500
001 005951007
003 MiAaHDL
005 20250106000000.0
006 m d
007 cr bn ---auaua
008 750211s1974 dcuao f000 0 eng d
035 ‡a(MiU)990059510070106381
035 ‡asdr-miu.990059510070106381
035 ‡z(MiU)MIU01000000000000005951007-goog
035 ‡a(OCoLC)1166394
035 ‡z(MiU)Aleph005951007
040 ‡aUDI ‡cUDI ‡dLHL ‡dBOMRI ‡dUtOrBLW
049 ‡aBMRA
086 0 ‡aI 28.23:7972
100 1 ‡aBeus, Michael J.
245 1 0 ‡aDevelopment of titanium load cells for support load determination / ‡cby Michael J. Beus and Earl L. Phillips.
260 ‡a[Washington, D.C.] : ‡bU.S. Bureau of Mines, ‡c[1974]
300 ‡aii, 35 p. : ‡billus., tables ; ‡c26 cm.
336 ‡atext ‡btxt ‡2rdacontent
337 ‡acomputer ‡bc ‡2rdamedia
338 ‡aonline resource ‡bcr ‡2rdacarrier
490 0 ‡aReport of investigations / United States. Bureau of Mines ; ‡v7972
504 ‡aIncludes bibliography.
538 ‡aMode of access: Internet.
650 0 ‡aMine timbering ‡xMeasurement.
650 0 ‡aMine roof bolting ‡xMeasurement.
700 1 ‡aPhillips, Earl L., ‡eauthor.
740 0 ‡aTitanium load cells.
899 ‡a39015078484394
CID ‡a005951007
DAT 0 ‡a20241218014708.0 ‡b20250106000000.0
DAT 1 ‡a20250107150716.0 ‡b2025-01-08T11:45:57Z
DAT 2 ‡a2024-12-24T18:30:02Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-009
FMT ‡aBK
HOL ‡0sdr-miu.990059510070106381 ‡aMiU ‡bSDR ‡cGWLA ‡f005951007 ‡pmdp.39015078484394 ‡sMIU ‡1990059510070106381
974 ‡bMIU ‡cGWLA ‡d20250108 ‡sgoogle ‡umdp.39015078484394 ‡y1974 ‡rpd ‡qbib ‡tUS fed doc