Critical path planning and scheduling applied to mining operations

LDR 01092cam a2200313Ia 4500
001 005949537
003 MiAaHDL
005 20221206000000.0
006 m d
007 cr bn ---auaua
008 840113s1966 dcua f000 0 eng d
035 ‡a(MiU)990059495370106381
035 ‡asdr-miu.990059495370106381
035 ‡z(MiU)MIU01000000000000005949537-goog
035 ‡a(OCoLC)10297455
035 ‡z(MiU)Aleph005949537
040 ‡aCJM ‡cCJM ‡dUDI ‡dOCLCQ ‡dLHL ‡dBOMRI
049 ‡aBMRA
086 0 ‡aI 28.23:6739
100 1 ‡aMathias, Adrian J.
245 1 0 ‡aCritical path planning and scheduling applied to mining operations / ‡cby Adrian J. Mathias and Donald E. Redmon.
260 ‡a[Washington, D.C.] : ‡bU.S. Dept. of the Interior, Bureau of Mines, ‡c[1966]
300 ‡aii, 48 p. : ‡bill. ; ‡c26 cm.
490 0 ‡aReport of investigations / Bureau of Mines ; ‡v6739
504 ‡aBibliography p. 30.
538 ‡aMode of access: Internet.
650 0 ‡aMining engineering.
650 0 ‡aCritical path analysis.
700 1 ‡aRedmon, Donald E.
899 ‡a39015078468330
CID ‡a005949537
DAT 0 ‡a20080826025613.0 ‡b20221206000000.0
DAT 1 ‡a20221209140727.0 ‡b2024-02-23T18:55:42Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990059495370106381 ‡aMiU ‡bSDR ‡cGWLA ‡f005949537 ‡pmdp.39015078468330 ‡sMIU ‡1990059495370106381
974 ‡bMIU ‡cGWLA ‡d20240223 ‡sgoogle ‡umdp.39015078468330 ‡y1966 ‡rpd ‡qbib ‡tUS fed doc