Second annual report :
operation of the multi-effect multi-stage flash distillation plant (Clair Engle), San Diego, California /
by Catalytic Construction Company, Philadelphia, Pennsylvania for the Office of Saline Water, Chung-ming Wong, Director.
Description
- Language(s)
-
English
- Published
-
[Washington, D.C.] : U.S. Dept of the Interior, 1970.
- Note
-
"Contract No. 14-01-0001-1803."
"November 1970."
- Physical Description
-
ix, 229 p. :
illus., maps ;
26 cm.
Viewability
Item Link |
Original Source |
Full view
|
Technical Report Archive & Image Library
|