Mining method, technique, and cost of presplitting the flood control gate shaft, Littleville Dam, Huntington, Mass

LDR 01057cam a2200277Ia 4500
001 005889666
003 MiAaHDL
005 20221206000000.0
006 m d
007 cr bn ---auaua
008 970826s1965 dcuao f000 0 eng d
035 ‡a(MiU)990058896660106381
035 ‡asdr-miu.990058896660106381
035 ‡z(MiU)MIU01000000000000005889666-goog
035 ‡a(OCoLC)37532969
035 ‡z(MiU)Aleph005889666
040 ‡aMCY ‡cMCY ‡dOCLCQ ‡dLHL ‡dUSBMI
049 ‡aUSBI
086 0 ‡aI 28.27:8273
100 1 ‡aPaine, Rolf S.
245 1 0 ‡aMining method, technique, and cost of presplitting the flood control gate shaft, Littleville Dam, Huntington, Mass. / ‡cby Rolf S. Paine and N.A. Eilertsen.
260 ‡a[Washington, D.C.] : ‡bU.S. Dept. of the Interior, Bureau of Mines, ‡c[1965]
300 ‡aii, 28 p. : ‡bill. ; ‡c27 cm.
490 0 ‡aInformation circular / Bureau of Mines ; ‡v8273
538 ‡aMode of access: Internet.
650 0 ‡aShaft sinking.
650 0 ‡aMining engineering.
700 1 ‡aEilertsen, Nils A.
899 ‡a39015078464453
CID ‡a005889666
DAT 0 ‡a20080910024051.0 ‡b20221206000000.0
DAT 1 ‡a20221209060805.0 ‡b2024-02-23T18:55:26Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990058896660106381 ‡aMiU ‡bSDR ‡cGWLA ‡f005889666 ‡pmdp.39015078464453 ‡sMIU ‡1990058896660106381
974 ‡bMIU ‡cGWLA ‡d20240223 ‡sgoogle ‡umdp.39015078464453 ‡y1965 ‡rpd ‡qbib ‡tUS fed doc