Design and construction procedures for mounds in slowly permeable soils with seasonally high water tables

LDR 00952mam a2200229 a 4500
001 005761220
003 MiAaHDL
005 20071220000000.0
006 m d
007 cr bn ---auaua
008 970312s1975 wiuae b s000 0 eng d
035 ‡asdr-wu3801957
035 ‡a(OCoLC)36532232
040 ‡aGZM ‡cGZM
099 ‡aRBW7 ‡aAC21 ‡aP96 ‡a15.2
245 0 0 ‡aDesign and construction procedures for mounds in slowly permeable soils with seasonally high water tables / ‡cby James C. Converse ... [et al.]
260 ‡a[Madison, Wis. : ‡bSmall Scale Waste Management Project, University of Wisconsin--Madison and University of Wisconsin--Extension], ‡c1975.
300 ‡a[37] leaves : ‡bill., plans ; ‡c28 cm.
490 0 ‡aContributions from the small scale waste management project ; ‡v[15.2]
504 ‡aIncludes bibliographical references.
538 ‡aMode of access: Internet.
650 0 ‡aSewage disposal in the ground.
650 0 ‡aSewage disposal, Rural.
700 1 ‡aConverse, James C.
710 2 ‡aSmall Scale Waste Management Project (Wis.)
CID ‡a005761220
DAT 0 ‡a20071220104239.0 ‡b20071220000000.0
DAT 1 ‡a20120815134457.0 ‡b2023-06-21T18:08:57Z
DAT 2 ‡a2023-06-21T17:30:02Z ‡b2017-04-14T20:00:02Z
CAT ‡aSDR-WU ‡dUNKNOWN ‡lloader.pl-001-001
FMT ‡aBK
HOL ‡0sdr-wu3801957 ‡awu ‡bSDR ‡cWU ‡pwu.89064763410 ‡sWU ‡13801957
974 ‡bWU ‡cWU ‡d20230621 ‡sgoogle ‡uwu.89064763410 ‡y1975 ‡rpdus ‡qncn