Development of an economic model to compare median barrier costs. Second interim report

LDR 01587nam a2200445u 4500
001 005504139
003 MiAaHDL
005 20241221000000.0
006 m d
007 cr bn ---auaua
008 070314s1987 xxu f000 0 eng d
035 ‡a(MiU)990055041390106381
035 ‡asdr-miu.990055041390106381
035 ‡z(MiU)MIU01000000000000005504139-goog
035 ‡a(OCoLC)17108318
035 ‡a(umtri)UMTRI 76653
035 ‡z(MiU)Aleph005504139
040 ‡dMiAaUTR ‡dUtOrBLW
088 ‡aRR 138
088 ‡aFHWA/NY/RR-87/138
100 1 ‡aBryden, James E.
245 1 0 ‡aDevelopment of an economic model to compare median barrier costs. Second interim report.
260 ‡c1987.
300 ‡a39 p. : ‡b7 ref. graphs. tables.
336 ‡atext ‡btxt ‡2rdacontent
337 ‡aunmediated ‡bn ‡2rdamedia
338 ‡avolume ‡bnc ‡2rdacarrier
536 ‡bHPR FCP 41V3-462
536 ‡aFederal Highway Administration, Office of Research, Development and Technology, Washington, D.C.
538 ‡aMode of access: Internet.
590 ‡aAuthor corporate affiliation: New York State Department of Transportation, Engineering Research and Development Bureau, Albany
590 ‡aSubject code: CDHB
590 ‡aSubject code: SCE*C
590 ‡aSubject code: WNB
650 7 ‡aSimulation. ‡2trt
650 7 ‡aMedians. ‡2trt
650 7 ‡aHighway engineering. ‡2trt
650 7 ‡aCosts. ‡2trt
650 7 ‡aRoad Medians. ‡2umitrist
650 7 ‡aModeling/ Simulation. ‡2umitrist
650 7 ‡aHighway Engineering Costs. ‡2umitrist
700 1 ‡aBruno, Nicholas J.
700 1 ‡aFortuniewicz, Jan S.
899 ‡a39015075206279 ‡bUMTRI
CID ‡a005504139
DAT 0 ‡a20241217190708.0 ‡b20241221000000.0
DAT 1 ‡a20250102141216.0 ‡b2025-01-03T06:41:45Z
DAT 2 ‡a2024-06-26T17:30:02Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990055041390106381 ‡aMiU ‡bSDR ‡cMIU ‡f005504139 ‡pmdp.39015075206279 ‡sMIU ‡1990055041390106381
974 ‡bMIU ‡cMIU ‡d20250103 ‡sgoogle ‡umdp.39015075206279 ‡y1987 ‡rpd ‡qbib ‡tUS fed doc