Guidelines for estimating the cost effectiveness of high-occupancy vehicle lanes. Interim report

LDR 01536nam a2200433u 4500
001 005502429
003 MiAaHDL
005 20241221000000.0
006 m d
007 cr bn ---auaua
008 070314s1985 xxu f000 0 eng d
035 ‡a(MiU)990055024290106381
035 ‡asdr-miu.990055024290106381
035 ‡z(MiU)MIU01000000000000005502429-goog
035 ‡a(OCoLC)173449104
035 ‡a(umtri)UMTRI 74191
035 ‡z(MiU)Aleph005502429
040 ‡dMiAaUTR ‡dUtOrBLW
088 ‡a339-5
088 ‡aTTI-2-10-85-339-5
088 ‡aFHWA/TX-86/42+339-5
100 1 ‡aLomax, Timothy J.
245 1 0 ‡aGuidelines for estimating the cost effectiveness of high-occupancy vehicle lanes. Interim report.
260 ‡c1985.
300 ‡a67 p. : ‡b9 ref. graphs. illus. tables.
336 ‡atext ‡btxt ‡2rdacontent
337 ‡aunmediated ‡bn ‡2rdamedia
338 ‡avolume ‡bnc ‡2rdacarrier
536 ‡b2-10-85-339
536 ‡aTexas State Department of Highways and Public Transportation, Transportation Planning Division, Austin
538 ‡aMode of access: Internet.
590 ‡aAuthor corporate affiliation: Texas Transportation Institute, College Station
590 ‡aReport covers the period Sept 1984 - Nov 1985
590 ‡aSubject code: CDCM
590 ‡aSubject code: SCE*C
590 ‡aSubject code: YEG
650 7 ‡aHighway engineering. ‡2trt
650 7 ‡aGuidelines. ‡2trt
650 7 ‡aCosts. ‡2trt
650 7 ‡aReserved Lanes. ‡2umitrist
650 7 ‡aHighway Engineering Costs. ‡2umitrist
700 1 ‡aMorris, D. E.
899 ‡a39015075516883 ‡bUMTRI
CID ‡a005502429
DAT 0 ‡a20241217190757.0 ‡b20241221000000.0
DAT 1 ‡a20250102141216.0 ‡b2025-01-03T06:58:14Z
DAT 2 ‡a2024-06-26T17:30:02Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990055024290106381 ‡aMiU ‡bSDR ‡cMIU ‡f005502429 ‡pmdp.39015075516883 ‡sMIU ‡1990055024290106381
974 ‡bMIU ‡cMIU ‡d20250103 ‡sgoogle ‡umdp.39015075516883 ‡y1985 ‡rpd ‡qbib ‡tUS fed doc