Methods for allocating highway costs. Final report

LDR 01427nam a2200421u 4500
001 005479900
003 MiAaHDL
005 20241221000000.0
006 m d
007 cr bn ---auaua
008 070314s1981 xxu f000 0 eng d
035 ‡a(MiU)990054799000106381
035 ‡asdr-miu.990054799000106381
035 ‡z(MiU)MIU01000000000000005479900-goog
035 ‡a(OCoLC)173422881
035 ‡a(umtri)UMTRI 46992
035 ‡z(MiU)Aleph005479900
040 ‡dMiAaUTR ‡dUtOrBLW
088 ‡aSS-24-U.3-181
088 ‡aFHWA-PL-81-017
100 1 ‡aLee, Douglass B.
245 1 0 ‡aMethods for allocating highway costs. Final report.
260 ‡c1981.
300 ‡a79 p. : ‡b25 ref. graphs. tables.
336 ‡atext ‡btxt ‡2rdacontent
337 ‡aunmediated ‡bn ‡2rdamedia
338 ‡avolume ‡bnc ‡2rdacarrier
536 ‡bPPA-HW-115
536 ‡aFederal Highway Administration, Office of Program and Policy Planning, Washington, D.C.
538 ‡aMode of access: Internet.
590 ‡aAuthor corporate affiliation: Transportation Systems Center, Cambridge, Mass.
590 ‡aSubject code: SCC
590 ‡aSubject code: SCE
590 ‡aSubject code: SCE*C
590 ‡aSubject code: WWC
650 7 ‡aPricing. ‡2trt
650 7 ‡aHighway engineering. ‡2trt
650 7 ‡aCosts. ‡2trt
650 7 ‡aCost effectiveness. ‡2trt
650 7 ‡aHighway Engineering Costs. ‡2umitrist
650 7 ‡aCost Effectiveness Methods. ‡2umitrist
899 ‡a39015075548787 ‡bUMTRI
CID ‡a005479900
DAT 0 ‡a20241217191051.0 ‡b20241221000000.0
DAT 1 ‡a20250102141216.0 ‡b2025-01-03T07:10:14Z
DAT 2 ‡a2024-06-23T17:30:02Z
CAT ‡aSDR-MIU ‡cmiu ‡dALMA ‡lprepare.pl-004-008
FMT ‡aBK
HOL ‡0sdr-miu.990054799000106381 ‡aMiU ‡bSDR ‡cMIU ‡f005479900 ‡pmdp.39015075548787 ‡sMIU ‡1990054799000106381
974 ‡bMIU ‡cMIU ‡d20250103 ‡sgoogle ‡umdp.39015075548787 ‡y1981 ‡rpd ‡qbib ‡tUS fed doc