BWR blowdown/emergency core cooling ... quarterly progress report /
prepared for the United States Nuclear Regulatory Commission and Electric Power Research Institute.
Description
- Language(s)
-
English
- Published
-
Washington, D.C. : The Commission : -1981.
- Note
-
"GEAP-NUREG-21304..."
Description based on: 13th (Jan. 1-Mar. 31, 1979).
"NUREG/CR-1154."
Prepared for: U.S. Nuclear Regulatory Commission, --Apr.-June 1980, its Division of Reactor Safety Research, July-Sept. 1980, and its Office of Nuclear Regulatory Research, Division of Accident Evaluation, Oct.-Dec. 1980--Jan.-Apr. 1981; and for: the Electric Power Research Institute, --Jan.-Apr. 1981; and for: the Nuclear Engineering Division, General Electric Company, July-Sept. 1980--Jan.-Apr. 1981.
Prepared by: Nuclear Energy Engineering Division, General Electric Company, ; Nuclear Engineering Division, General Electric Company, Apr.-June 1979--Jan.-Apr. 1981.
- Physical Description
-
v. :
ill. ;
28 cm.
Viewability