Test report and design analysis:
high speed three phase alternating current conductor-collector system for San Francisco Bay Area Rapid Transit District. Prepared for Parsons Brinckerhoff, Tudor, Bechtel under Contract Z 412.
Description
Viewability
Item Link | Original Source |
---|---|
Limited (search only) | University of Michigan |